TopPage | Products | Mount Index
Plabase [PB] | Anchor Bolt Set [PBS] | Rubber Sheet for Plabase [PBG]

update: 1999-10-21
Outdoor Unit Installation
PLABASE


Plabase [PB]


RESIN MORTAR FORM-BASE - Light and Easy Handling!
pb.jpg pb-sekou.jpg
pb-sunpouzu.gif
Product No. A B C D Pcs/Pkg
PB-100 85 100.0 154.0 100 40
PB-120 117 142.5 205.5 120 30
Features
* Light and excellent in weather resistance.
* Frame work is not necessary and the form shall not be removed, hence, foundation work can be shortened.
* 2-piece construction allows foundation work after the rack has been fixed.
* Marks provided make installation work very simple.
* Anchoring can be omitted if used together with the optional ANCHOR BOLT SET PBS-120 (for PB-120 only).
Remarks Please use under the environment where the surface temperature shall be in the range of -20ーC to +60ーC.

Installation Procedure
1. Set PLABESE according to location marking line. pb-sekoutejyun-1.gif
2. Assemble 2 pieces of PLABASE.

There are 2 methods -
* from top to bottom
* from right to left (only for PB-100).
pb-sekoutejyun-2.gif
3. Filling mortar.

Ratio of mortar = Cement (100) : Sand (300) : Water (55)
pb-sekoutejyun-3.gif

Next Page


TopPage | Products | Mount Index
Plabase [PB] | Anchor Bolt Set [PBS] | Rubber Sheet for Plabase [PBG]